Cloughmore Medical Centre, Cardiff
Cloughmore Medical Centre is also a two storey steel framed building constructed off piled foundations to be built on the site of an existing medical centre with works starting in August 2013.
The building is provided with several energy efficient measures such as a 20KW photovoltaic range, auto dimming lighting on photocells, stack ventilation system, energy efficient taps and increased thermal and air leakage performance. This has resulted in the building achieving an Energy Performance of 18 which is the best performing health care building in Wales and in the top 10 in the UK. This building was awarded BREEAM Excellent.